29146

Norm Ringstad, in his capacity as the Project Assessment Director of the Tulsequah Chief Mine Project, Sheila Wynn, in her capacity as the Executive Director, Environmental Assessment Office, et al. v. The Taku River Tlingit First Nation and Melvin Jack, on behalf of himself and all other members of the Taku River Tlingit First Nation, et al.

(British Columbia) (Civil) (By Leave)

Docket

Judgments on applications for leave to appeal are rendered by the Court, but are not necessarily unanimous.

List of proceedings
Date Proceeding Filed By
(if applicable)
2005-02-15 Appeal closed
2005-02-07 Record returned to the Registrar of the Court of Appeal
2004-11-19 Judgment on appeal and notice of deposit of judgment sent to all parties
2004-11-18 Judgment on the appeal rendered, CJ Ma Ba Bi LeB De F, The appeal from the judgments of the Court of Appeal of British Columbia (Vancouver), Numbers CA027488 and CA027500, dated January 31, 2002, heard on March 24, 2004 is allowed. Leave to appeal was granted on terms that the appellants pay the party and party costs of the respondents, Taku River Tlingit First Nation and Melvin Jack, on behalf of himself and all other members of the Taku River Tlingit First Nation, for the application for leave to appeal and for the appeal in any event of the cause. There is no order as to costs with respect to the respondents Redfern Resources Ltd. and Redcorp Ventures Ltd.
Allowed
2004-11-16 Correspondence received from, Gowlings, re: lock-up First Nations Summit
2004-11-16 Correspondence received from, from Arthur Pape, re: lock-up The Taku River Tlingit First Nation and Melvin Jack, on behalf of himself and all other members of the Taku River Tlingit First Nation
2004-11-09 Correspondence received from, Pape & Salter, re: lock-up The Taku River Tlingit First Nation and Melvin Jack, on behalf of himself and all other members of the Taku River Tlingit First Nation
2004-11-05 Correspondence received from, Paul Yearwood dated 11/05/04 re: use of laptop in the lock-up Norm Ringstad, in his capacity as the Project Assessment Director of the Tulsequah Chief Mine Project, Sheila Wynn, in her capacity as the Executive Director, Environmental Assessment Office
2004-10-26 Correspondence received from, Josephine Norris, re: Lock-up The Taku River Tlingit First Nation and Melvin Jack, on behalf of himself and all other members of the Taku River Tlingit First Nation
2004-10-26 Correspondence received from, Paul J. Pearlman, Q.C., re: Lock-up. Norm Ringstad, in his capacity as the Project Assessment Director of the Tulsequah Chief Mine Project, Sheila Wynn, in her capacity as the Executive Director, Environmental Assessment Office
2004-10-22 Correspondence received from, Randy Kaardal, re: lock-up Redfern Resources Ltd.
2004-10-15 Correspondence (sent by the Court) to, to all parties, re: lock-up
2004-04-14 Transcript received, (224 pages - joint with 29419)
2004-03-25 Judgment reserved OR rendered with reasons to follow
2004-03-25 Acknowledgement and consent for video taping of proceedings, from all parties
2004-03-24 Hearing of the appeal, 2004-03-24, CJ Ma Ba Bi LeB De F
Judgment reserved
2004-03-24 Respondent's condensed book, (14 copies) The Taku River Tlingit First Nation and Melvin Jack, on behalf of himself and all other members of the Taku River Tlingit First Nation
2004-03-24 Appellant's condensed book, (14 copies) Norm Ringstad, in his capacity as the Project Assessment Director of the Tulsequah Chief Mine Project, Sheila Wynn, in her capacity as the Executive Director, Environmental Assessment Office
2004-03-23 Correspondence received from, Quebec lawyers are on strik Mar. 25/04 Attoney General of Québec
2004-03-23 Supplemental document, Application for leave of Mikisew Cree First Nation (14 copies) served by fax Doig River First Nation
2004-03-04 Notice of appearance, from Noel & Associés Attoney General of Québec
2004-02-25 Notice of appearance, from Gowlings Union of British Columbia Indian Chiefs
2004-02-24 Notice of appearance, from Braker and Company First Nations Summit
2004-02-23 Notice of appearance, from Gowlings Attorney General of Alberta
2004-02-20 Notice of appearance, from Rath & Company Doig River First Nation
2004-02-19 Notice of appearance, from Blake Cassels & Graydon Redfern Resources Ltd.
2004-02-18 Notice of appearance, from Fasken Martineau Business Council of British Columbia, British Columbia & Yukon Chamber of Mines, British Columbia Chamber of Commerce, British Columbia Wildlife Federation, Council of Forest Industries
2004-02-18 Notice of appearance, from Gowlings The Taku River Tlingit First Nation and Melvin Jack, on behalf of himself and all other members of the Taku River Tlingit First Nation
2004-02-16 Notice of appearance, from Fuller Pearlman McNeil The Minister of the Environment, Lands and Parks and the Minister of Energy and Mines and Minister Responsible for Northern Development
2004-02-16 Notice of appearance, from Mitchell Taylor Attorney General of Canada
2003-12-01 Decision on motion to extend time, to serve and file the intervener, Union of British Columbia Indian Chiefs, book of authorities to Nov. 19/03, Reg
Granted
2003-12-01 Submission of motion to extend time, Reg
2003-11-24 Response to motion to extend time, (Letter Form), from P. Pearlman dated Nov. 20, 2003 (fax copy), Completed on: 2003-11-24 Norm Ringstad, in his capacity as the Project Assessment Director of the Tulsequah Chief Mine Project, Sheila Wynn, in her capacity as the Executive Director, Environmental Assessment Office
2003-11-24 Notice of hearing sent to parties
2003-11-20 Appeal hearing scheduled, 2004-03-24, (previously Dec. 9)
Judgment reserved
2003-11-19 Motion to extend time, to file the book of authorities to 11/19/03, Completed on: 2003-11-19 Union of British Columbia Indian Chiefs
2003-11-19 Book of authorities, Completed on: 2003-11-19 Union of British Columbia Indian Chiefs
2003-11-07 Correspondence received from, P. Pearlman dated Nov. 7, 2003 (fax copy) re: enclosing information outlining developments since the judgment of B.C. C.A. Norm Ringstad, in his capacity as the Project Assessment Director of the Tulsequah Chief Mine Project, Sheila Wynn, in her capacity as the Executive Director, Environmental Assessment Office
2003-10-09 Order on motion to extend time
2003-10-08 Decision on motion to extend time, Ba, to serve and file the factum and book of authorities of the intervener Doig River First Nation to July 25, 2003, nunc pro tunc and for an order permitting the intervener to make oral submissions at the hearing of the appeal.
Granted
2003-10-08 Submission of motion to extend time, Ba
2003-09-26 Response to motion to extend time, from R. Kaardall, Completed on: 2003-09-26 Redfern Resources Ltd.
2003-09-19 Response to motion to extend time, Completed on: 2003-09-19 The Taku River Tlingit First Nation and Melvin Jack, on behalf of himself and all other members of the Taku River Tlingit First Nation
2003-09-19 Order by, Ba, UPON APPLICATIONS by the Attorney General of Canada, the Attorney General of Quebec, the Attorney General of Alberta, the Union of British Columbia Indian Chiefs, the First Nations Summit, the Business Council of British Columbia, British Columbia & Yukon Chamber of Mines, British Columbia Chamber of Commerce, British Columbia Wildlife Federation, Council of Forest Industries, Mining Association of British Columbia, Aggregate Producers Association of British Columbia and the Doig River First Nation for leave to intervene in the above appeal and pursuant to the orders of May 29 and July 18, 2003;
AND HAVING READ the material filed ;
IT IS HEREBY FURTHER ORDERED THAT the said interveners are each granted permission to present oral argument not exceeding fifteen (15) minutes.
Granted
2003-09-12 Book of authorities, Completed on: 2003-09-12 Attorney General of Alberta
2003-09-12 Intervener's factum, Completed on: 2003-09-12 Attorney General of Alberta
2003-09-09 Response to motion to extend time, (Letter Form), from Burke-Robertson dated Sept. 9, 2003 (via e-mail), Completed on: 2003-09-09 Norm Ringstad, in his capacity as the Project Assessment Director of the Tulsequah Chief Mine Project, Sheila Wynn, in her capacity as the Executive Director, Environmental Assessment Office
2003-09-08 Motion to extend time, to file the factum and authorities to July 25, 2003 and permitting oral argument, Completed on: 2003-09-08 Doig River First Nation
2003-09-05 Decision on motion to extend time, to serve and file the intervener, First Nations Summit, book of authorities to July 24/03, Reg
Granted
2003-09-05 Submission of motion to extend time, Reg
2003-08-27 Response to motion to extend time, (e-mail) by the First Nations Summit, Completed on: 2003-08-27 Redfern Resources Ltd.
2003-08-27 Response to motion to extend time, to serve and file the intervener, First Nations Summit, book of authorities to July 24/03, Completed on: 2003-08-27 Norm Ringstad, in his capacity as the Project Assessment Director of the Tulsequah Chief Mine Project, Sheila Wynn, in her capacity as the Executive Director, Environmental Assessment Office
2003-08-26 Response to motion to extend time, to serve and file the intervener, First Nations Summit, book of authorities to July 24/03, Completed on: 2003-08-26 The Taku River Tlingit First Nation and Melvin Jack, on behalf of himself and all other members of the Taku River Tlingit First Nation
2003-07-31 Motion to extend time, (3 copies) to serve and file its book of authorities to July 24, 2003, Completed on: 2003-07-31 First Nations Summit
2003-07-28 Respondent's book of authorities, (3 volumes), Completed on: 2003-07-28 The Taku River Tlingit First Nation and Melvin Jack, on behalf of himself and all other members of the Taku River Tlingit First Nation
2003-07-25 Book of authorities, Completed on: 2003-07-25 Doig River First Nation
2003-07-25 Intervener's factum, Completed on: 2003-07-25 Doig River First Nation
2003-07-24 Book of authorities, Completed on: 2003-07-28 First Nations Summit
2003-07-23 Respondent's record, (2 volumes), Completed on: 2003-07-23 The Taku River Tlingit First Nation and Melvin Jack, on behalf of himself and all other members of the Taku River Tlingit First Nation
2003-07-23 Intervener's factum, Completed on: 2003-07-23 First Nations Summit
2003-07-23 Intervener's factum, Completed on: 2003-07-28 Union of British Columbia Indian Chiefs
2003-07-21 Book of authorities, Completed on: 2003-07-21 Attorney General of Canada
2003-07-21 Intervener's factum, Completed on: 2003-07-28 Attorney General of Canada
2003-07-21 Book of authorities, Completed on: 2003-07-21 Attoney General of Québec
2003-07-21 Intervener's factum, Completed on: 2003-07-28 Attoney General of Québec
2003-07-18 Order on motion for leave to intervene, (BY BINNIE J.)
2003-07-18 Decision on the motion for leave to intervene, Bi, This is an application by the Attorney General of Alberta for an extension of time and for leave to intervene in this appeal. The application for an extension of time is granted. Insofar as the Attorney General of Alberta seeks to widen the issues beyond those framed by the parties, the application should be denied. Apart from anything else, point (iii) would require a substantial factual record with respect to specific treaties and their specific provisions, and such enlargement of the factual record is simply beyond the scope of this appeal.

Accordingly, the intervention of the Attorney General of Alberta, as with that of other interveners, must be restricted to the issues framed by the parties and other matters incidental thereto that do not require further evidence or other supplement to the record filed by the parties.

On that more restricted basis, the motion for leave to intervene of the applicant, the Attorney General of Alberta, is granted and the applicant shall be entitled to serve and file a factum not to exceed 20 pages in length.

The request to present oral argument is deferred to a date following receipt and consideration of the written arguments of the parties and the interveners.

As stated, the applicant, the Attorney General of Alberta, shall not be entitled to adduce further evidence or otherwise supplement the record of the parties.

Pursuant to Rule 59(1)(a), the intervener shall pay to the appellants and respondents any additional disbursements occasioned to the appellants and respondents by the intervention (for reasons see order on file).
Granted
2003-07-18 Decision on motion to extend time, Bi, (see order on intervention)
Granted
2003-07-18 Submission of motion to extend time, Bi
2003-07-18 Submission of motion for leave to intervene, Bi
2003-07-16 Book of authorities, Completed on: 2003-07-16 Business Council of British Columbia, British Columbia & Yukon Chamber of Mines, British Columbia Chamber of Commerce, British Columbia Wildlife Federation, Council of Forest Industries
2003-07-16 Intervener's factum, Completed on: 2003-07-16 Business Council of British Columbia, British Columbia & Yukon Chamber of Mines, British Columbia Chamber of Commerce, British Columbia Wildlife Federation, Council of Forest Industries
2003-07-14 Response to the motion for leave to intervene, (Letter Form), from P. Pearlman dated July 14, 2003 (fax copy) re: intervention by A. G. Alberta, Completed on: 2003-07-14 Norm Ringstad, in his capacity as the Project Assessment Director of the Tulsequah Chief Mine Project, Sheila Wynn, in her capacity as the Executive Director, Environmental Assessment Office
2003-07-11 Correspondence received from, (by fax) A. Pape re: allocation of time for oral argument The Taku River Tlingit First Nation and Melvin Jack, on behalf of himself and all other members of the Taku River Tlingit First Nation
2003-07-11 Respondent's factum, (see order), Completed on: 2003-07-11 The Taku River Tlingit First Nation and Melvin Jack, on behalf of himself and all other members of the Taku River Tlingit First Nation
2003-07-11 Response to the motion for leave to intervene, (Letter Form), from A. Pape dated July 11, 2003 (fax copy) re: intervention by A. G. Alberta, Completed on: 2003-07-11 The Taku River Tlingit First Nation and Melvin Jack, on behalf of himself and all other members of the Taku River Tlingit First Nation
2003-07-09 Response to the motion for leave to intervene, (Letter Form), from Rath & Co. (A. Rana) dated July 9, 2003 (fax copy) re: intervention by A. G. Alberta, Completed on: 2003-07-09 Doig River First Nation
2003-07-07 Motion to extend time, to file the motion to intervene (joint), Completed on: 2003-07-07 Attorney General of Alberta
2003-07-07 Motion for leave to intervene, (joint with extension of time), also affidavits of E.V. Bemmel and Neil Reddekopp, Completed on: 2003-07-07 Attorney General of Alberta
2003-06-10 Discontinuance of miscellaneous motion, (Letter Form), from P. J. Pearlman, Q.C. (by fax) Norm Ringstad, in his capacity as the Project Assessment Director of the Tulsequah Chief Mine Project, Sheila Wynn, in her capacity as the Executive Director, Environmental Assessment Office
2003-06-09 Correspondence received from, R. Kaardal dated June 6/03 re: in response to Mr. Pape's letter of May 30/03 (fax) Redfern Resources Ltd.
2003-06-06 Notice of miscellaneous motion, abridging the time for the respondents, Taku River, to file their factum and other documents (book form), Completed on: 2003-06-06 Norm Ringstad, in his capacity as the Project Assessment Director of the Tulsequah Chief Mine Project, Sheila Wynn, in her capacity as the Executive Director, Environmental Assessment Office
2003-06-03 Respondent's book of authorities, Completed on: 2003-06-03 Redfern Resources Ltd.
2003-06-03 Respondent's record, Completed on: 2003-06-03 Redfern Resources Ltd.
2003-06-03 Respondent's factum, Completed on: 2003-06-03 Redfern Resources Ltd.
2003-06-02 Correspondence received from, Arthur Pape dated 05/30/03 re: order of May 28, 2003 adding Redfern Resources as a party The Taku River Tlingit First Nation and Melvin Jack, on behalf of himself and all other members of the Taku River Tlingit First Nation
2003-05-28 Order on motion for leave to intervene, BY BASTARACHE J.)
2003-05-28 Decision on the motion for leave to intervene, Ba, The motion for leave to intervene of the applicant, the Attorney General of Canada, is granted and the applicant shall be entitled to serve and file a factum not to exceed 20 pages in length.
The motion for leave to intervene of the applicant, the Attorney General of Quebec, is granted and the applicant shall be entitled to serve and file a factum not to exceed 20 pages in length.
The motion for leave to intervene of the applicant, the Union of British Columbia Indian Chiefs, is granted and the applicant shall be entitled to serve and file a factum not to exceed 15 pages in length.
The motion for leave to intervene of the applicant, the First Nations Summit, is granted and the applicant shall be entitled to serve and file a factum not to exceed 20 pages in length.
The motion for leave to intervene of the applicant, the Business Council of British Columbia, British Columbia & Yukon Chamber of Mines, British Columbia Chamber of Commerce, British Columbia Wildlife Federation, Council of Forest Industries, Mining Association of British Columbia, Aggregate Producers Association of British Columbia, is granted and the applicant shall be entitled to serve and file a factum not to exceed 20 pages in length.
The motion for leave to intervene of the applicant, Doig River First Nation, is granted and the applicant shall be entitled to serve and file a factum not to exceed 30 pages in length.
The request to present oral argument is deferred to a date following receipt and consideration of the written arguments of the parties and the interveners.
The interveners shall not be entitled to adduce further evidence or otherwise to supplement the record of the parties.
Pursuant to Rule 59(1)(a) the interveners shall pay to the appellants and respondents any additional disbursements occasioned to the appellants and respondents by the intervention.
Granted
2003-05-28 Order on motion to add or substitute parties, (BY BASTARACHE J.)
2003-05-28 Decision on motion to add or substitute parties, Ba, The Applicant Redfern is declared to be a party Respondent to this appeal. Redfern shall be entitled to serve and file a factum no later than one week after the date of this order. The time for the Respondents Taku River Tlingit First Nation and Melvin Jack to serve and file its factum is extended to ten weeks after the date when Redfern is required to serve and file its factum. The costs of this motion shall be in the cause.
Granted
2003-05-27 Submission of motion for leave to intervene, Ba
2003-05-27 Submission of motion to add or substitute parties, Ba
2003-05-27 Response to the motion for leave to intervene, (Letter Form), from Burke-Robertson dated May 27, 2003 (via e-mail) re: intervention by A. G. Canada, Completed on: 2003-05-27 Norm Ringstad, in his capacity as the Project Assessment Director of the Tulsequah Chief Mine Project, Sheila Wynn, in her capacity as the Executive Director, Environmental Assessment Office
2003-05-26 Response to motion to add or substitute parties, (Letter Form), from Burke-Robertson dated May 24, 2003 (fax copy) re: supports the motion by Redfern Resources (joint), Completed on: 2003-05-26 Norm Ringstad, in his capacity as the Project Assessment Director of the Tulsequah Chief Mine Project, Sheila Wynn, in her capacity as the Executive Director, Environmental Assessment Office
2003-05-26 Response to the motion for leave to intervene, (Letter Form), from Burke-Robertson dated May 24, 2003 (fax copy) re: interventions by Business Council, Union of BC, A.G.Quebec and Canada First Nations - joint, Completed on: 2003-05-26 Norm Ringstad, in his capacity as the Project Assessment Director of the Tulsequah Chief Mine Project, Sheila Wynn, in her capacity as the Executive Director, Environmental Assessment Office
2003-05-07 Reply to the motion for leave to intervene, (Letter Form), from Rath & Co. (A. Rana) dated May 6, 2003 (fax copy), Completed on: 2003-05-07 Doig River First Nation
2003-05-02 Appeal perfected for hearing
2003-04-30 Reply to the motion for leave to intervene, (Letter Form), from C. Willms dated April 29, 2003 (fax copy), Completed on: 2003-04-30 Business Council of British Columbia, British Columbia & Yukon Chamber of Mines, British Columbia Chamber of Commerce, British Columbia Wildlife Federation, Council of Forest Industries
2003-04-29 Response to the motion for leave to intervene, (Letter Form), from A. Pape dated April 15, 2003 (fax copy), Completed on: 2003-04-29 The Taku River Tlingit First Nation and Melvin Jack, on behalf of himself and all other members of the Taku River Tlingit First Nation
2003-04-22 Reply to the motion for leave to intervene, book form, Completed on: 2003-04-22 Doig River First Nation
2003-04-14 Response to the motion for leave to intervene, book form re: Doig River's intervention, Completed on: 2003-04-14 Norm Ringstad, in his capacity as the Project Assessment Director of the Tulsequah Chief Mine Project, Sheila Wynn, in her capacity as the Executive Director, Environmental Assessment Office
2003-04-04 Motion for leave to intervene, Completed on: 2003-04-04 Attorney General of Canada
2003-04-03 Motion for leave to intervene, 5 copies, Completed on: 2003-04-03 Attoney General of Québec
2003-04-03 Motion for leave to intervene, Completed on: 2003-04-03 Union of British Columbia Indian Chiefs
2003-04-03 Motion for leave to intervene, book form, Completed on: 2003-04-03 First Nations Summit
2003-04-03 Book of authorities, vol. 1 and 2 re: motion to intervene, Completed on: 2003-04-03 Doig River First Nation
2003-04-03 Motion for leave to intervene, book form, Completed on: 2003-04-03 Doig River First Nation
2003-04-03 Motion for leave to intervene, book form, Completed on: 2003-04-03 Business Council of British Columbia, British Columbia & Yukon Chamber of Mines, British Columbia Chamber of Commerce, British Columbia Wildlife Federation, Council of Forest Industries
2003-03-31 Reply to motion to add or substitute parties, 3 copies, Completed on: 2003-03-31 Redcorp Ventures Ltd. formerly known as Redfern Resources Ltd. ("Redfern")
2003-03-27 Correspondence (sent by the Court) to, all parties; re: new tentative hearing date of Dec. 9/03
2003-03-26 Response to motion to add or substitute parties, Completed on: 2003-03-26 The Taku River Tlingit First Nation and Melvin Jack, on behalf of himself and all other members of the Taku River Tlingit First Nation
2003-03-17 Motion to add or substitute parties, (to be added as a party respondent or alternatively be granted leave to intervene) - book form, Completed on: 2003-03-17 Redcorp Ventures Ltd. formerly known as Redfern Resources Ltd. ("Redfern")
2003-03-06 Appellant's book of authorities, Completed on: 2003-03-06 Norm Ringstad, in his capacity as the Project Assessment Director of the Tulsequah Chief Mine Project, Sheila Wynn, in her capacity as the Executive Director, Environmental Assessment Office
2003-03-06 Appellant's record, Vol. I to XI, Completed on: 2003-03-06 Norm Ringstad, in his capacity as the Project Assessment Director of the Tulsequah Chief Mine Project, Sheila Wynn, in her capacity as the Executive Director, Environmental Assessment Office
2003-03-06 Appellant's factum, Completed on: 2003-03-06 Norm Ringstad, in his capacity as the Project Assessment Director of the Tulsequah Chief Mine Project, Sheila Wynn, in her capacity as the Executive Director, Environmental Assessment Office
2003-02-11 Appeal court record, (1 envelope)
2002-12-13 Notice of appeal, Completed on: 2002-12-13 Norm Ringstad, in his capacity as the Project Assessment Director of the Tulsequah Chief Mine Project, Sheila Wynn, in her capacity as the Executive Director, Environmental Assessment Office
2002-12-02 Correspondence received from, Pape & Salter dated Nov. 28/02 with acknowledgement & consent to broadcast The Taku River Tlingit First Nation and Melvin Jack, on behalf of himself and all other members of the Taku River Tlingit First Nation
2002-11-21 Correspondence (sent by the Court) to, all parties; re: filing timetable / tentative hearing dated (Oct. 15/03)
2002-11-15 Judgment on leave sent to the parties
2002-11-14 Judgment of the Court on the application for leave to appeal, The application for leave to cross-appeal is dismissed and the application for leave to appeal from the judgment of the Court of Appeal of British Columbia (Vancouver), Numbers CA027488 and CA027500, dated January 31, 2002, is granted with costs to the Respondents the Taku River Tlingit First Nation and Melvin Jack on a party and party basis in any event of the cause.
Granted, with costs
2002-11-14 Judgment of the Court on the application for leave to cross-appeal
Dismissed
2002-10-15 All material on the application for leave to cross-appeal submitted to the Judges, CJ Ba De
2002-10-15 All materials on application for leave submitted to the Judges, CJ Ba De
2002-06-07 Reply to the memorandum in response to the argument on cross-appeal, Completed on: 2002-06-07 The Taku River Tlingit First Nation and Melvin Jack, on behalf of himself and all other members of the Taku River Tlingit First Nation
2002-05-30 Memorandum of argument in response to the cross-appeal, (joint with reply), Completed on: 2002-05-30 Norm Ringstad, in his capacity as the Project Assessment Director of the Tulsequah Chief Mine Project, Sheila Wynn, in her capacity as the Executive Director, Environmental Assessment Office
2002-05-30 Applicant's reply to respondent's argument, (joint with response to cross-appeal), Completed on: 2002-05-30 Norm Ringstad, in his capacity as the Project Assessment Director of the Tulsequah Chief Mine Project, Sheila Wynn, in her capacity as the Executive Director, Environmental Assessment Office
2002-04-29 Application for leave to cross-appeal, (joint with response to leave application), Completed on: 2002-04-29 The Taku River Tlingit First Nation and Melvin Jack, on behalf of himself and all other members of the Taku River Tlingit First Nation
2002-04-29 Respondent's response on the application for leave to appeal, (joint with cross-appeal), Completed on: 2002-04-29 The Taku River Tlingit First Nation and Melvin Jack, on behalf of himself and all other members of the Taku River Tlingit First Nation
2002-04-24 Correspondence received from, (CA Order has been settled; sending a copy asap) Norm Ringstad, in his capacity as the Project Assessment Director of the Tulsequah Chief Mine Project, Sheila Wynn, in her capacity as the Executive Director, Environmental Assessment Office
2002-04-15 Letter acknowledging receipt of an incomplete application for leave to appeal
2002-04-02 Application for leave to appeal, (formal order of C.A. received May 3, 2002), Completed on: 2002-05-06 Norm Ringstad, in his capacity as the Project Assessment Director of the Tulsequah Chief Mine Project, Sheila Wynn, in her capacity as the Executive Director, Environmental Assessment Office

Parties

Please note that in the case of closed files, the “Status” column reflects the status of the parties at the time of the proceedings. For more information about the proceedings and about the dates when the file was open, please consult the docket of the case in question.

Main parties

Main parties - Appellants
Name Role Status
Norm Ringstad, in his capacity as the Project Assessment Director of the Tulsequah Chief Mine Project, Sheila Wynn, in her capacity as the Executive Director, Environmental Assessment Office Appellant Active
The Minister of the Environment, Lands and Parks and the Minister of Energy and Mines and Minister Responsible for Northern Development Appellant Active

v.

Main parties - Respondents
Name Role Status
The Taku River Tlingit First Nation and Melvin Jack, on behalf of himself and all other members of the Taku River Tlingit First Nation Respondent Active
Redfern Resources Ltd. Respondent Active
Redcorp Ventures Ltd. formerly known as Redfern Resources Ltd. ("Redfern") Respondent Active

Other parties

Other parties
Name Role Status
Business Council of British Columbia, British Columbia & Yukon Chamber of Mines, British Columbia Chamber of Commerce, British Columbia Wildlife Federation, Council of Forest Industries Intervener Active
Mining Association of British Columbia and Aggregate Producers Association of British Columbia Intervener Active
Doig River First Nation Intervener Active
First Nations Summit Intervener Active
Union of British Columbia Indian Chiefs Intervener Active
Attoney General of Québec Intervener Active
Attorney General of Canada Intervener Active
Attorney General of Alberta Intervener Active

Counsel

Party: Norm Ringstad, in his capacity as the Project Assessment Director of the Tulsequah Chief Mine Project, Sheila Wynn, in her capacity as the Executive Director, Environmental Assessment Office

Counsel
Names
Paul Pearlman, Q.C.
Kathryn L. Kickbush
Contact information
Fuller Pearlman & McNeil
103 - 1216 Broad Street
Victoria, British Columbia
V8W 2A5
Telephone: (250) 388-4550
FAX: (250) 388-7133
Agent
Name
Robert E. Houston, Q.C.
Contact information
Burke-Robertson
70 Gloucester Street
Ottawa, Ontario
K2P 0A2
Telephone: (613) 566-2058
FAX: (613) 235-4430
Email: rhouston@burkerobertson.com

Party: The Minister of the Environment, Lands and Parks and the Minister of Energy and Mines and Minister Responsible for Northern Development

Counsel
Names
Paul Pearlman, Q.C.
Kathryn L. Kickbush
Contact information
Fuller Pearlman & McNeil
103 - 1216 Broad Street
Victoria, British Columbia
V8W 2A5
Telephone: (250) 388-4550
FAX: (250) 388-7133
Agent
Name
Robert E. Houston, Q.C.
Contact information
Burke-Robertson
70 Gloucester Street
Ottawa, Ontario
K2P 0A2
Telephone: (613) 566-2058
FAX: (613) 235-4430
Email: rhouston@burkerobertson.com

Party: The Taku River Tlingit First Nation and Melvin Jack, on behalf of himself and all other members of the Taku River Tlingit First Nation

Counsel
Names
Arthur C. Pape
Jean Teillet
Melvin Jack
Contact information
Pape & Salter
460 - 220 Cambie St
Vancouver, British Columbia
V6B 2M9
Telephone: (604) 681-3002 Ext: 1
FAX: (604) 681-3050
Email: apape@pstlaw.ca
Agent
Name
Henry S. Brown, Q.C.
Contact information
Gowling WLG (Canada) LLP
2600 - 160 Elgin St
P.O. Box 466, Stn "D"
Ottawa, Ontario
K1P 1C3
Telephone: (613) 233-1781
FAX: (613) 788-3433
Email: henry.brown@gowlings.com

Party: Redfern Resources Ltd.

Counsel
Name
R. Kaardal
Contact information
Blake, Cassels & Graydon LLP
Suite 2600, Three Bentall Centre
595 Burrard Street, P.O. Box 49314
Vancouver, British Columbia
V7X 1L3
Telephone: (604) 631-3300
FAX: (604) 631-3309
Agent
Name
Gordon K. Cameron
Contact information
Blake, Cassels & Graydon LLP
World Exchange Plaza
20th Floor, 45 O'Connor
Ottawa, Ontario
K1P 1A4
Telephone: (613) 788-2222
FAX: (613) 788-2247
Email: gord.cameron@blakes.com

Party: Redcorp Ventures Ltd. formerly known as Redfern Resources Ltd. ("Redfern")

Counsel
Name
R. Kaardal
Contact information
Blake, Cassels & Graydon LLP
Suite 2600, Three Bentall Centre
595 Burrard Street, P.O. Box 49314
Vancouver, British Columbia
V7X 1L3
Telephone: (604) 631-3300
FAX: (604) 631-3309
Agent
Name
Gordon K. Cameron
Contact information
Blake, Cassels & Graydon LLP
World Exchange Plaza
20th Floor, 45 O'Connor
Ottawa, Ontario
K1P 1A4
Telephone: (613) 788-2222
FAX: (613) 788-2247
Email: gord.cameron@blakes.com

Party: Business Council of British Columbia, British Columbia & Yukon Chamber of Mines, British Columbia Chamber of Commerce, British Columbia Wildlife Federation, Council of Forest Industries

Counsel
Name
Charles F. Willms
Contact information
Fasken Martineau DuMoulin
2100 - 1075 Georgia St West
Vancouver, British Columbia
V6E 3G2
Telephone: (604) 631-3131
FAX: (604) 631-3232
Agent
Name
Jeffrey W. Beedell
Contact information
Lang Michener
300 - 50 O'Connor Street
Ottawa, Ontario
K1P 6L2
Telephone: (613) 232-7171
FAX: (613) 231-3191
Email: jbeedell@langmichener.ca

Party: Mining Association of British Columbia and Aggregate Producers Association of British Columbia

Counsel
Name
Charles F. Willms
Contact information
Fasken Martineau DuMoulin
2100 - 1075 Georgia St West
Vancouver, British Columbia
V6E 3G2
Telephone: (604) 631-3131
FAX: (604) 631-3232
Agent
Name
Jeffrey W. Beedell
Contact information
Lang Michener
300 - 50 O'Connor Street
Ottawa, Ontario
K1P 6L2
Telephone: (613) 232-7171
FAX: (613) 231-3191
Email: jbeedell@langmichener.ca

Party: Doig River First Nation

Counsel
Names
Jeffrey R.W. Rath
Allisun Rana
Contact information
Rath & Company
Box 44 Site 8
RR 1
Priddis, Alberta
T0L 1W0
Telephone: (403) 931-4047
FAX: (403) 931-4048
Agent
Name
Brian A. Crane, Q.C.
Contact information
Gowling WLG (Canada) LLP
2600 - 160 Elgin St
Box 466 Station D
Ottawa, Ontario
K1P 1C3
Telephone: (613) 233-1781
FAX: (613) 563-9869
Email: brian.crane@gowlingwlg.com

Party: First Nations Summit

Counsel
Names
Hugh M.G. Braker, Q.C.
Anja Brown
Jonathan Sarin
Contact information
Braker & Company
Suite 1108 - 100 Park Royal
West Vancouver, British Columbia
V7T 1A2
Telephone: (250) 723-1993
FAX: (250) 723-1994
Email: hbraker@island.net
Agent
Name
Brian A. Crane, Q.C.
Contact information
Gowling WLG (Canada) LLP
2600 - 160 Elgin St
Box 466 Station D
Ottawa, Ontario
K1P 1C3
Telephone: (613) 233-1781
FAX: (613) 563-9869
Email: brian.crane@gowlingwlg.com

Party: Union of British Columbia Indian Chiefs

Counsel
Name
Robert J. M. Janes
Contact information
Cook, Roberts
7th Floor - 1175 Douglas Street
Victoria, British Columbia
V8W 2E1
Telephone: (250) 385-1411
FAX: (250) 413-3300
Agent
Name
Brian A. Crane, Q.C.
Contact information
Gowling WLG (Canada) LLP
2600 - 160 Elgin St
Box 466 Station D
Ottawa, Ontario
K1P 1C3
Telephone: (613) 233-1781
FAX: (613) 563-9869
Email: brian.crane@gowlingwlg.com

Party: Attoney General of Québec

Counsel
Name
Pierre-Christian Labeau
Contact information
Ministère de la Justice du Québec
1200, route de l'Église, 2e étage
Sainte-Foy, Quebec
G1V 4M1
Telephone: (418) 643-1477
FAX: (418) 646-1696
Agent
Name
Sylvie Roussel
Contact information
Noël et Associés, s.e.n.c.r.l.
111 Rue Champlain
Hull, Quebec
J8X 3R1
Telephone: (819) 771-7393
FAX: (819) 771-5397

Party: Attorney General of Canada

Counsel
Names
Mitchell R. Taylor
Brian McLaughlin
Craig Cameron
Contact information
Attorney General of Canada
900 - 840 Howe Street
Vancouver, British Columbia
V6Z 2S9
Telephone: (604) 666-2287
FAX: (604) 666-5925
Email: mitch.taylor@justice.gc.ca
Agent
Name
Christopher M. Rupar
Contact information
Attorney General of Canada
Bank of Canada Building - East Tower
1216 - 234 Wellington Street
Ottawa, Ontario
K1A 0H8
Telephone: (613) 941-2351
FAX: (613) 954-1920
Email: Christopher.Rupar@justice.gc.ca

Party: Attorney General of Alberta

Counsel
Names
Kurt J.W. Sandstrom
Stan Rutwind
Contact information
Attorney General of Alberta
Room 418, 4th Floor, Bowker Building
9833 - 109 Street
Edmonton, Alberta
T5K 2E8
Telephone: (780) 422-4160
FAX: (780) 425-0307
Email: kurt.sandstrom@gov.ab.ca
Agent
Name
Henry S. Brown, Q.C.
Contact information
Gowling WLG (Canada) LLP
2600 - 160 Elgin St
P.O. Box 466, Stn "D"
Ottawa, Ontario
K1P 1C3
Telephone: (613) 233-1781
FAX: (613) 788-3433
Email: henry.brown@gowlings.com

Summary

Keywords

None.

Summary

Case summaries are prepared by the Office of the Registrar of the Supreme Court of Canada (Law Branch). Please note that summaries are not provided to the Judges of the Court. They are placed on the Court file and website for information purposes only.

The Respondent, Redfern Resources Ltd.("Redfern") proposed to reopen a mine on the Taku River system, and to construct a 160 kilometre access road to the mine through a wilderness area in Northwestern British Columbia from Atlin to Tolsequah. The area to be traversed by the proposed road was the portion of the traditional territory of the Respondent, the Taku River Tlingit First Nation (the "Tlingits"), where their traditional land use activities were most concentrated. The area is not covered by a treaty but at the relevant time, was the subject of treaty negotiations between the Tlingits and the Governments of Canada and British Columbia. Redfern's proposal to reopen the mine was subject to an environmental review process under the Environmental Assessment Act. The Project Committee undertook the statutory review process in consultation with Canadian, British Columbia and Alaska government representatives, Tlingit representatives and the public over the course of three and a half years. The Committee submitted their Recommendations Report to the Provincial Ministers, recommending that the project proceed with certain mitigation strategies to accommodate the Tlingits' concerns. The Tlingits at all times asserted their aboriginal rights and their concerns about the impact of the proposed road on their culture and habitat and on their treaty negotiations and provided their own recommendations to the Ministers in an appendix to the report. Shortly afterwards, a Project Approval Certificate was issued by the Ministry of the Environment.

The Tlingits applied for judicial review. They claimed aboriginal title to a substantial area of north western British Columbia and stated that the road would interfere with their hunting fishing and gathering activities and with their aboriginal title. Prior to the hearing of the judicial review, an application was made for an order severing those issues raised in the petition for judicial review requiring proof of aboriginal rights or aboriginal title from the petition and referring them to the trial list. An order to this effect was granted and leave to appeal from that order was refused by Goldie J.A. and an application to review that decision was dismissed by the Court of Appeal on September 22, 1999. A determination of the aboriginal rights and title issue has not yet proceeded.

In the judicial review proceedings, the Chambers judge found that the Ministers should have been mindful of the possibility that their decision might infringe on aboriginal rights, and that they should have been more careful to ensure that they had effectively addressed the Tlingits' concerns. The Chambers judge set aside the Minsters' decision and directed a reconsideration, requiring the Project Committee to reconvene to discuss the Tlingits' concerns and to prepare a revised draft recommendations report. This order was appealed by Redfern and the Ministers while the Tlingits cross-appealed. The majority of the Court of Appeal dismissed the Ministers' appeal on the question of whether they owed a constitutional and fiduciary duty of consultation to the Tlingits who had asserted aboriginal title.

Lower court rulings

June 28, 2000
Supreme Court of British Columbia

A990300

Respondents' application for declarations that Report and Referral to the Ministers failed to conform to legal requirements dismissed; Project Approval Certificate quashed and set aside; Matter referred to the Ministers for reconsideration

January 31, 2002
Court of Appeal for British Columbia (Vancouver)

CA027488, CA027500

Appeal from order quashing Certificate dismissed; Matter remitted to the Ministers for reconsideration

Filed documents

The memorandums of argument on an application for leave to appeal will be posted here 30 days after leave to appeal has been granted unless they contain personal information, information that is subject to a publication ban, or any other information that is not part of the public record. You may also obtain copies of the memorandum by filling out the Request for Court records form or by contacting the Court’s Records Centre either by email at records-dossiers@scc-csc.ca or by telephone at 613‑996‑7933 or at 1‑888‑551‑1185.

If you have questions about a memorandum of argument or want to use a memorandum of argument, please contact the author of the memorandum of argument directly. Their name appears at the end of the memorandum of argument. The contact information for counsel is found in the “Counsel” tab of this page.

Downloadable PDFs

Not available

The factums of the appellant, the respondent and the intervener will be posted here at least 2 weeks before the hearing unless they contain personal information, information that is subject to a publication ban, or any other information that is not part of the public record. You may also obtain copies of factums by filling out the Request for Court records form or by contacting the Court’s Records Centre either by email at records-dossiers@scc-csc.ca or by telephone at 613‑996‑7933 or at 1‑888‑551‑1185.

If you have questions about a factum or want permission to use a factum, please contact the author of the factum directly. Their contact information appears on the first page of each factum.

Downloadable PDFs

Not available

The condensed books of the appellant, the respondent and the intervener will be posted here upon receipt of the electronic version, 2 days prior to the scheduled appeal hearing. You may also obtain copies of condensed books by filling out the Request for Court records form or by contacting the Court’s Records Centre either by email at records-dossiers@scc-csc.ca or by telephone at 613‑996‑7933 or at 1‑888‑551‑1185.